thiết kế website, thiết kế website chuyên nghiệp
logo
company

thống kê truy cập

Online: 11
Total: 689,086

Typical Project Information

Water supply assessment of model tested at Lim and Minh Duc town

 

Location: Bắc Ninh, Hải Phòng

Client Name / Capital: Water and Sanitation Program, World Bank

Start: 09/2007

End: 12/2007

Brief description of project:

Pilot model water was conducted in two towns Lim - Bac Ninh and Minh Duc Town, Hai Phong in the form: DBL: Design - Build - Operate Lease. This new model is being implemented on a pilot basis: only 1 bidder will be involved from the design stage, and then construction and then management and operation. Pilot on the purpose of reducing waste between design and actual operation. The contractor will determine the size and demand of local water supply. Therefore, the water factory will meet and match local needs.

To rate strength and weaknesse points of the model in the following area: Social, financial, technical and institutional. Comparing the efficiency of investment and management models between model DBL: Design - Build - Operate Lease (because only one bidder made) with D + B and more than 1 DB by contractors perform.

Consultant contractor scope of works:

The objective job performance: Evaluate the pilot model water level in 2 towns (DBL), Compared with the model D + B and DB ago.

The work performed of Consultant included:

Organizational design and evaluation activities including preparation methods / tools / materials, actual survey, data collection

Conduct a comparison between the old model with pilot model in the fields of financial, technical, institutional and social...

Given the comparative assessment and specific recommendations.